US 183 Turn Lane Addition
Commissioner Horne, Precinct 2 | Engineer: Quiddity Engineering, LLC


This project will design improvements to US 183 from Magnolia Avenue to the Plum Creek Bridge to enhance safety and mobility as Caldwell County continues to grow. US 183 currently includes two lanes in each direction.
IMPROVEMENTS
Widening the roadway to include:
A continuous center turn lane
Shoulders on both sides
COST: $6.7M
PURPOSE
Enhance roadway safety
Improve mobility
RIGHT OF WAY
This project is anticipated to require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined. Funding for right-of-way acquisition and construction has not been identified.
SCHEDULE
DESIGN: 2025 — 2027
Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by early 2027. Timelines for right-of-way acquisition and construction have not been determined.
Contact
Phone: (512) 813-1835
Email: info@caldwellroadbond.com