SH 142 East

Commissioner Westmoreland, Precinct 1 | Engineer: American Structurepoint, Inc.

This project will design improvements to SH 142 from SH 130 to Windsor Boulevard to enhance safety and mobility as this area of Caldwell County continues to grow. The existing roadway includes one lane in each direction and a continuous center turn lane.


IMPROVEMENTS

  • Widening and reconstructing the road to include two travel lanes in each direction with a continuous center turn lane


COST: $886,000


PURPOSE

  • Enhance roadway safety

  • Improve mobility


RIGHT OF WAY

This project is anticipated to require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined. Funding for right-of-way acquisition and construction has not been identified.


SCHEDULE

DESIGN: 2025 — 2027

The design process will include evaluations of traffic, drainage, and environmental features, along with community input. Design is expected to be completed by early 2027. Timelines for right-of-way acquisition and construction have not been determined.