SH 142 East
Commissioner Westmoreland, Precinct 1 | Engineer: American Structurepoint, Inc.


This project will design improvements to SH 142 from SH 130 to Windsor Boulevard to enhance safety and mobility as this area of Caldwell County continues to grow. The existing roadway includes one lane in each direction and a continuous center turn lane.
IMPROVEMENTS
Widening and reconstructing the road to include two travel lanes in each direction with a continuous center turn lane
COST: $886,000
PURPOSE
Enhance roadway safety
Improve mobility
RIGHT OF WAY
This project is anticipated to require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined. Funding for right-of-way acquisition and construction has not been identified.
SCHEDULE
DESIGN: 2025 — 2027
The design process will include evaluations of traffic, drainage, and environmental features, along with community input. Design is expected to be completed by early 2027. Timelines for right-of-way acquisition and construction have not been determined.