This project will design and construct improvements to North Magnolia Avenue (US 183) and reconstruct the Union Pacific Railroad crossing to improve traffic flow and safety in downtown Luling.
IMPROVEMENTS
Reconstructing and widening the roadway to include a continuous center turn lane
Replacing the existing open drainage with underground drainage
Replacing traffic signals at the intersections with SH 80 and E. Pierce Street
Improving the Union Pacific Railroad crossing
COST: $13.1M
PURPOSE
Enhance overall roadway safety
Improve mobility
Improving the Union Pacific Railroad Crossing
RIGHT OF WAY
This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.
SCHEDULE
DESIGN: 2025 — 2027
CONSTRUCTION: 2028 — 2029
Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by early 2027, with construction anticipated to begin in early 2028. All timelines are estimates and will be updated as the project progresses.
Contact
Phone: (512) 813-1835