North Hackberry Ave. (Alternate Truck Route)
Commissioner Horne, Precinct 2 | Engineer: Rodriquez Transportation Group, Inc.


This project will design and construct improvements to North Hackberry Avenue from SH 90 (Pierce Street) to SH 80 (San Marcos Highway) to create and enhance safety and improve mobility in downtown Luling.
IMPROVEMENTS
Repaving the roadway
Replacing the existing open drainage with underground drainage
Improving the Union Pacific Railroad crossing
COST: $4.8M
PURPOSE
Enhance overall roadway safety
Improve mobility
Creating an alternate truck route
Improving the Union Pacific Railroad Crossing
RIGHT OF WAY
This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.
SCHEDULE
DESIGN: 2025 — 2026
CONSTRUCTION: 2027 — 2029
Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by late 2026, with construction anticipated to begin in mid-2027. All timelines are estimates and will be updated as the project progresses.