FM 2720 Realignment
Commissioner Theriot, Precinct 3 | Engineer: HDR Engineering, Inc.


This project will design improvements to FM 2720 to enhance safety and mobility as this area of Caldwell County continues to grow. The project will follow CR 153 (Grist Mill Rd.) from SH 21 to Old Spanish Trail, then continues along a new alignment to FM 2720. The final alignment for the new route has not been determined.
IMPROVEMENTS
Extending the roadway to connect directly to Grist Mill Road
Repaving CR 153 (Grist Mill Rd.) from SH 21 to Old Spanish Trail
Widening the roadway to include two-foot shoulders on both sides
Installing a traffic signal at the SH 21 intersection
COST: $460,000
PURPOSE
Enhance roadway safety
Improve mobility
RIGHT OF WAY
This project will require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined. Funding for right-of-way acquisition and construction has not been identified.
SCHEDULE
DESIGN: 2025 — 2027
The design process will include evaluations of traffic, drainage, and environmental features, along with community input. Design is expected to be completed by early 2027. Timelines for right-of-way acquisition and construction have not been determined.
Contact
Phone: (512) 813-1835
Email: info@caldwellroadbond.com