FM 2720 Realignment

Commissioner Theriot, Precinct 3 | Engineer: HDR Engineering, Inc.

This project will design improvements to FM 2720 to enhance safety and mobility as this area of Caldwell County continues to grow. The project will follow CR 153 (Grist Mill Rd.) from SH 21 to Old Spanish Trail, then continues along a new alignment to FM 2720. The final alignment for the new route has not been determined.


IMPROVEMENTS

  • Extending the roadway to connect directly to Grist Mill Road

  • Repaving CR 153 (Grist Mill Rd.) from SH 21 to Old Spanish Trail

  • Widening the roadway to include two-foot shoulders on both sides

  • Installing a traffic signal at the SH 21 intersection


COST: $460,000


PURPOSE

  • Enhance roadway safety

  • Improve mobility


RIGHT OF WAY

This project will require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined. Funding for right-of-way acquisition and construction has not been identified.


SCHEDULE

DESIGN: 2025 — 2027

The design process will include evaluations of traffic, drainage, and environmental features, along with community input. Design is expected to be completed by early 2027. Timelines for right-of-way acquisition and construction have not been determined.