Creekside Drive at Plum Creek
Commissioner Horne, Precinct 2 | Engineer: Pape-Dawson Consulting Engineers, LLC.


This project will plan, design, and construct a new bridge over Plum Creek and widen the roadway to provide a safe crossing during flooding and high-intensity storm events. The existing low-water crossing includes a culvert and two deteriorating 10-foot lanes without shoulders, within approximately 40 feet of right of way.
IMPROVEMENTS
Upgrading the drainage culvert
Widening and reconstructing the road to include:
One 12-foot lane in each direction
Shoulders and abridge rail over the creek
COST: $5.5M
PURPOSE
Mitigate flooding risks
Provide a safer and more reliable creek crossing
Enhance overall roadway safety
RIGHT OF WAY
This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.
SCHEDULE
DESIGN: 2025 — 2027
CONSTRUCTION: 2028 — 2029
The existing low-water crossing will be evaluated to determine its capacity and future needs. Design is expected to be completed by late 2027, with construction anticipated to begin in early 2028. Construction will be phased over approximately 15 months. All timelines are estimates and will be updated as the project progresses.