CR 182 (Dry Creek Road)

Commissioner Thomas, Precinct 4 | Engineer: RS&H, Inc.

This project will design and construct repairs to CR 182 (Dry Creek Road), including roadway resurfacing, to improve pavement conditions, beginning at FM 1185 and continuing south along 1.01 miles of CR 182.


IMPROVEMENTS

  • Resurfacing and repairing the roadway


COST: $800,000


PURPOSE

  • Repair deteriorating pavement

  • Enhance overall roadway safety

  • Improve mobility


RIGHT OF WAY

This project is not anticipated to require additional right of way to complete construction.


SCHEDULE

DESIGN: 2025 — 2026

CONSTRUCTION: 2026

Design is expected to be completed by early 2026, with construction anticipated to begin in mid-2026. All timelines are estimates and will be updated as the project progresses.