CR 133 (Ivy Switch) at McNeil Creek
Commissioner Horne, Precinct 2


Caldwell County is planning to design and construct new drainage infrastructure and roadway improvements on CR 133 (Ivy Switch) where it meets McNeil Creek to provide a safer creek crossing and enhance overall roadway safety. The existing low-water crossing includes one narrow and deteriorating travel lane in each direction without shoulders or bridge rails over the creek.
IMPROVEMENTS
Upgrading the drainage infrastructure
Reconstructing and widening the roadway to include:
One 12-foot lane in each direction
Shoulders and bridge rails over the creek
COST: $3.23M
PURPOSE
Mitigate flooding risks
Provide a safer and more reliable creek crossing
Enhance overall roadway safety
RIGHT OF WAY
This project may require additional right-of-way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.
SCHEDULE
DESIGN: 2025 — 2027
CONSTRUCTION: 2028 — 2029
The existing low-water crossingwill be evaluated to determine its existing capacity and future needs. Design is expected to be completed by mid-2027, with construction anticipated to begin in early 2028. Construction will be phased over approximately 12 months. All timelines are estimates and will be updated as the project progresses.