This project will design and construct improvements to City Line Road from SH 142 to Old Fentress Road to enhance safety and improve mobility as this area of the County continues to grow. The existing roadway includes one lane in each direction without shoulders.


IMPROVEMENTS

  • Reconstructing and widening the roadway to include:

    • A continuous center turn lane

    • A sidewalk and shared-use path (SUP) for pedestrians and bicyclists

  • Realigning the roadway where it meets SH 142 to align with Windsor Boulevard at a four-way intersection

  • Realigning the intersection at Maple Street to a four-way intersection


COST: $15.9M


PURPOSE

  • Enhance roadway safety

  • Improve mobility


RIGHT OF WAY

This project may require additional right of way in order to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.


SCHEDULE

DESIGN: 2025 — 2027

CONSTRUCTION: 2027 — 2029

Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by early 2027, with construction anticipated to begin by late 2027. All timelines are estimates and will be updated as the project progresses.

Contact

  • Facebook
Sign up for email updates to receive information on project status and major milestones.

© 2025 by Caldwell County Road Bond

Caldwell county Road Bond logo
bottom of page