Bridle Path
Commissioner Horne, Precinct 2 | Engineer: Doucet & Associates, Inc.


This project will design and construct improvements to Bridle Path from US 183 to FM 2984 to enhance safety and improve mobility as this area of the County continues to grow. The existing roadway includes a single, deteriorating travel lane with open drainage and no shoulders.
IMPROVEMENTS
Widening and reconstructing the roadway to include shoulders
Implementing intersection improvements, including:
Adding a turn lane and traffic signal at US 183
Adding a turn lane at FM 2984
COST: $9.3M
PURPOSE
Enhance roadway safety
Improve mobility
RIGHT OF WAY
This project may require additional right of way in order to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.
SCHEDULE
DESIGN: 2025 — 2027
CONSTRUCTION: 2027 — 2028
Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by early 2027, with construction anticipated to begin in late 2027. All timelines are estimates and will be updated as the project progresses.