top of page
Infographics_Flag_Design.png

Polonia Road en Plum Creek

Comisionado Westmoreland, Distrito 1 y Comisionado Theriot, Distrito 3 | Ingeniero: Seiler Lankes Group, LLC

Caldwell County is planning to design and construct new drainage infrastructure and roadway improvements on Polonia Road where it meets Plum Creek to provide a safer creek crossing and enhance overall roadway safety. The existing low-water crossing includes a single narrow and deteriorating travel lane in each direction without shoulders.


IMPROVEMENTS

  • Constructing a new culvert

  • Reconstructing and widening the roadway to include:

  • One 12-foot lane in each direction

  • Shoulders and bridge rails over the creek


COST: $5.5M


PURPOSE

  • Mitigate flooding risks

  • Provide a safer and more reliable creek crossing

  • Enhance overall roadway safety


RIGHT OF WAY

This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.


SCHEDULE

DESIGN: 2025 — 2027

CONSTRUCTION: 2028 — 2029

The existing low-water crossing will be evaluated to determine its capacity and future needs. Design is expected to be completed by mid-2027, with construction anticipated to begin in early 2028. Construction will be phased over approximately 15 months. All timelines are estimates and will be updated as the project progresses.

Contacto

Teléfono: (512) 813-1835

Correo electrónico: info@caldwellroadbond.com

  • Facebook
Regístrese para recibir actualizaciones por correo electrónico para recibir información sobre el estado del proyecto y los principales hitos.

© 2025 por Caldwell County Road Bond

bottom of page