Adición de carril de giro en la avenida N. Magnolia (US 183).

Comisionado Horne, Distrito 2 | Ingeniero: Quiddity Engineering, Inc.

This project will design and construct improvements to North Magnolia Avenue (US 183) and reconstruct the Union Pacific Railroad crossing to improve traffic flow and safety in downtown Luling.


IMPROVEMENTS

  • Reconstructing and widening the roadway to include a continuous center turn lane

  • Replacing the existing open drainage with underground drainage

  • Replacing traffic signals at the intersections with SH 80 and E. Pierce Street

  • Improving the Union Pacific Railroad crossing


COST: $13.1M


PURPOSE

  • Enhance overall roadway safety

  • Improve mobility

  • Improving the Union Pacific Railroad Crossing


RIGHT OF WAY

This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.


SCHEDULE

DESIGN: 2025 — 2027

CONSTRUCTION: 2028 — 2029

Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by early 2027, with construction anticipated to begin in early 2028. All timelines are estimates and will be updated as the project progresses.

Contacto

Teléfono: (512) 813-1835

Correo electrónico: info@caldwellroadbond.com

  • Facebook
Regístrese para recibir actualizaciones por correo electrónico para recibir información sobre el estado del proyecto y los principales hitos.

© 2025 por Caldwell County Road Bond

bottom of page