Avenida North Hackberry (Ruta alternativa para camiones)

Comisionado Horne, Distrito 2 | Ingeniero: Rodriquez Transportation Group, Inc.

This project will design and construct improvements to North Hackberry Avenue from SH 90 (Pierce Street) to SH 80 (San Marcos Highway) to create and enhance safety and improve mobility in downtown Luling.


IMPROVEMENTS

  • Repaving the roadway

  • Replacing the existing open drainage with underground drainage

  • Improving the Union Pacific Railroad crossing


COST: $4.8M


PURPOSE

  • Enhance overall roadway safety

  • Improve mobility

  • Creating an alternate truck route

  • Improving the Union Pacific Railroad Crossing


RIGHT OF WAY

This project may require additional right of way to complete construction. Once design is underway, a better estimate of right-of-way needs will be determined.


SCHEDULE

DESIGN: 2025 — 2026

CONSTRUCTION: 2027 — 2029

Current traffic, drainage, and environmental features will be evaluated, along with community input, to inform project design. Design is expected to be completed by late 2026, with construction anticipated to begin in mid-2027. All timelines are estimates and will be updated as the project progresses.

Contacto

Teléfono: (512) 813-1835

Correo electrónico: info@caldwellroadbond.com

  • Facebook
Regístrese para recibir actualizaciones por correo electrónico para recibir información sobre el estado del proyecto y los principales hitos.

© 2025 por Caldwell County Road Bond

bottom of page