Comisionado Thomas, Distrito 4 | Ingeniero: RS&H, Inc.

This project will design and construct repairs to CR 179 (Hommanville Trail), including roadway resurfacing, beginning at FM 1185 and continuing northwest along 1.56 miles of CR 279.


IMPROVEMENTS

  • Repaving and repairing the roadway


COST: $1.2M


PURPOSE

  • Address deteriorating pavement

  • Enhance overall roadway safety

  • Improve mobility


RIGHT OF WAY

This project is not anticipated torequire additional right of way to complete construction.


SCHEDULE

DESIGN: 2025 — 2026

CONSTRUCTION: 2026

Design is expected to be completed by early 2026, with construction anticipated to begin in mid-2026. All timelines are estimates and will be updated as the project progresses.

Contacto

Teléfono: (512) 813-1835

Correo electrónico: info@caldwellroadbond.com

  • Facebook
Regístrese para recibir actualizaciones por correo electrónico para recibir información sobre el estado del proyecto y los principales hitos.

© 2025 por Caldwell County Road Bond

bottom of page